January 20, 2013
It’s a holiday weekend but I’m back in the small room for a 3/4 day of file management (primarily).
I have 11 songs with something like a total of 400 audio …
January 18, 2013
It’s file management mostly and making rough mixes. I’m making a database with a sheet for every song with every file name and notes for the file if needed. This will save a lot of time at the mix sessions – if the engineer knows which is the low harmony without having to listen… so now I have to figure out which is which. I have not been the one recording and naming the files…
January 18, 2013
11 AM start, it’s taken me a month to realise that trying to make music before 11 is, 90% of the time, a waste of time. And with singing, which …
January 16, 2013
I wake up to the sound of doors downstairs and assume it must be around 7.45 – when Frank goes to school – but I look at the clock and …
January 15, 2013
Other than driving home from NYC, yesterday was actually a proper day off, and I wake up early today. I’m booked with Mark at SoneLab from 11 but I’m there …
January 14, 2013
I drove down to NYC on Friday, dropped Will off in Bushwick, ate at his excellent local cantina, left the car with him (free street parking) and took a cab …
January 10, 2013
This last 10 days has not been easy. But we are getting there. Today was my last day in MA before the NYC sessions at the Magic Shop with Joan …
January 9, 2013
Yesterday was supposed to be a complete day off, but it wasn’t. I had to make rough mixes for a couple of hours in the afternoon and I didn’t sleep …
January 8, 2013
We carry on where we left off, with Blair and I in the small room and Will with Mark in the big one.
First of all I must get the Synth …
January 6, 2013
Maybe that's slang for something awful but today I was on double duty – with Blair in the small room and with William in the main studio.